Renovation, Rebuilding & New Construction Across G-9/1 to G-9/4 and Karachi Company Markaz
G-9 sits alongside Karachi Company Markaz and one of the city's busier transport interchanges, which makes it unusually well connected and unusually busy for a residential sector. Plot sizes are predominantly 10 Marla and 1 Kanal across the G-9/1 to G-9/4 sub-sectors, and the housing stock is a mix of original builds and houses that have been renovated or extended over the years.
The work here leans toward renovation, extension and finishing — updating kitchens and bathrooms, adding a storey, replacing services, and fixing the damp and waterproofing problems that decades of Islamabad monsoons inevitably produce. Al Sadat Builders handles the full scope in G-9, from a single bathroom rebuild to a complete house modernisation.
Direct supervision by Syed Mujtaba Shah on every site.
Density and age define the working conditions here.
Older G-9 houses commonly show salt staining and damp patches. We trace it to its source — failing DPC, absent plinth protection, poor drainage falls — and correct the cause before new finishes are applied.
Original wiring and pipework rarely suit modern loads. We replace services properly during renovation rather than adding to a system already past its design life.
G-9's internal streets are narrow and busy. Excavation spoil removal, concrete delivery and material staging need careful scheduling to keep the street usable for neighbours.
Adding an upper floor requires both structural verification of the existing footings and compliance with CDA's height and covered-area limits — we check both before designing.
Every stage of your project handled by one team, under one contract and one itemised BOQ.
Turnkey residential and commercial construction, managed end to end by the founder. Available across G-9, with site supervision by Syed Mujtaba Shah.
Learn more →Complete 5 Marla to 1 Kanal house construction, from foundation to key handover. Available across G-9, with site supervision by Syed Mujtaba Shah.
Learn more →Grade 60 steel, branded cement and supervised concrete pours for the structural shell. Available across G-9, with site supervision by Syed Mujtaba Shah.
Learn more →Kitchen and bathroom remodelling, extensions, and full interior modernisation. Available across G-9, with site supervision by Syed Mujtaba Shah.
Learn more →Precision marble and large-format porcelain installation for floors, stairs and walls. Available across G-9, with site supervision by Syed Mujtaba Shah.
Learn more →Reinforced boundary walls, retaining structures and gate piers built on proper footings. Available across G-9, with site supervision by Syed Mujtaba Shah.
Learn more →Internal and external plaster, basement tanking and roof waterproofing systems. Available across G-9, with site supervision by Syed Mujtaba Shah.
Learn more →Renovation, extension and new construction across the G-9 sub-sectors.
G-9's most common plot size. Renovations typically open the ground floor, add a bedroom and modernise the kitchen, bathrooms and services.
Full modernisation or rebuild — upgraded services, contemporary joinery, imported sanitary and improved waterproofing throughout.
Upper floors added with independent column framing, designed within CDA height limits and supported by verified or strengthened existing footings.
Targeted projects with proper waterproofing membranes, concealed plumbing and precision tile and marble installation.
Adding a floor is the most common submission we handle in this sector.
Send us your plot details and we will prepare an itemised BOQ for G-9 with no obligation.
In almost every case it is moisture from below or outside the wall rather than a paint failure. Failing damp-proof course, missing plinth protection, poor drainage falls around the building and unsealed external faces all let water into the masonry, and the salts it carries show up as efflorescence. Repainting over it looks fine for one season and then returns. We trace and correct the source, then finish the wall properly.
Often yes, subject to two checks. First, the existing footings and walls have to be capable of carrying the extra load — many single-storey houses in this sector were not designed for a second floor and need strengthening. Second, the addition has to comply with CDA's height and covered-area limits, which means a revised submission and approval before work starts.
It depends on how much you replace. A targeted kitchen and bathroom renovation costs a fraction of a whole-house modernisation with full service replacement. We provide an itemised BOQ separating structure, waterproofing, services and finishing so you can see the cost of each element and decide the scope deliberately.
Select your sector or society for area-specific guidance on bylaws, terrain and typical plot sizes.
Tell us what needs fixing. We will inspect the house and give you an itemised, staged quotation.